Submitted by Stefanie Botelho. This final phase involves the conversion of the existing Runway 9-27 to a 35-ft. (10.7 m) wide parallel taxiway), construction of the 35-ft. final connector taxiway to the new 4,200 by 75 ft. (1,280 by 23 m) runway, and associated infrastructure. More...
19 mars 2017
Crews unearth artifacts during excavation for airpark project
Commentaires